⚠ This tool is designed for tablet use. For best results, open on an iPad.
CLEARBRIDGE
Operating Solutions
OEE Calculator
CLEARBRIDGE
Operating Solutions
OEE Assessment
Overall Equipment Effectiveness
Machine Setup
Step 1 of 2
What are we measuring? (e.g. CNC Cell 3, Haas VF-2)
Total scheduled hours for this shift, including breaks.
hours
Total planned stop time: breaks, lunch, shift meetings. Not downtime — just the scheduled pauses.
minutes
When everything's dialed in and the machine is running clean, how many parts per hour should it produce?
parts/hr
Today's Actuals
Step 2 of 2
All unplanned stops this shift: breakdowns, changeovers, material waits, tool changes. Add them up and enter the total. Enter 0 if none recorded.
minutes
Everything that came off — good parts, scrap, rework, all of it.
parts
Good parts cannot exceed total parts produced.
Parts that passed inspection on the first try. No rework, no rejects. If everything passed, this matches the number above.
parts
Shift or production date for this assessment.
OEE Results
Waiting for inputs
Complete Both Steps Above
Fill in machine setup and today's actuals — results will calculate automatically.